Coast & Harbor Engineering  
HOME |  SERVICES |  CONTACT US | ABOUT US | CAREERS | NEWS   
Crescent Bar Marina
Shoreline Protection / Stabilization
Coastal Habitat Restoration
Coastal Processes Analysis & Numerical Modeling
Harbors & Marinas
Navigation Channels and Waterways
Deep-Draft Vessel & Fast-Ferry Hydrodynamic Effects
Dredging and Dredged Material Disposal
Coast, River & Estuarine Hydraulics & Geomorphology
Marine Terminals
 

CRESCENT BAR RECREATIONAL IMPROVEMENTS
Wanapum Lake, Washington


Crescent Bar Existing ConditionsCoast & Harbor Engineering (CHE) assisted in the development of recreation programs for the Grant County No. 2 (PUD)’s Shoreline Management Plan. PUD was planning on making upland and in-water recreational improvements to the Priest Rapids Project at Crescent Bar, located on Wanapum Lake. CHE completed feasibility engineering analysis and preliminary design process for the in-water components at Crescent Bar. CHE was responsible for the following elements:

  Extending and replacing a two lane boat launch to improve usability at lower water level conditions.
  Replacing existing boarding floats with new ADA compliant floating dock/abutment.
 

Dredging an entrance channel from entrance buoys to the boat ramp including vicinity of bridge and boat launch.

  Stabilizing the shoreline along PUD property and existing campground (approximately 1,100 ft of shoreline).
  Evaluating the relocation of the swimming beach.
  Evaluating the cost of fuel float replacement.

 

 
Copyright © 2011  ·  Coast & Harbor Engineering, Inc.  ·   All Rights Reserved   ·   www.coastharboreng.com